View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0000493 | T99X171.00 SKB Eagle | HW | public | 2019-02-22 11:32 | 2019-03-13 13:57 |
| Reporter | (SW) Jacky Chiang | Assigned To | Due Date | ||
| Priority | normal | Severity | s2-severe | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0000493: Test Condition (temperature) | ||||
| Description | Test Condition (temperature) | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
| User List |
|
|---|
|
|
[1/29] SKB request that high temperature setup 50 ℃ at Environmental condition. High temperature should be setup 50 ℃ at all reliability test (If some tests setup over 50 ℃, keep your spec. ex) thermal shock, HALT and so on) [1/29] It will be discussed with HW engineer seperately. But it should be update here [2/13] Reliablity test should be tested with SKB requirement(50 ℃) Thermal Shock and HALT test should test with Foxconn test condition(70 ℃) |
|
|
HI Sean. I gave SKB to your thermal test report. SKB said to the result is good, but they request that bottm also should be meet uner 40 degree |
|
|
Hi SB, We will work with our thermal engineer to evalute the solution for this request. However, as you know that to keep bottom case in the same spec as top is not quite reasonable. We will update you the possible solution and the impact if we will need to improve bottom temperature to under 40 degree @ 25deg. room temperature. |
|
|
Our thermal engineer and QA engineer is look into this issue. However, the thermal instrument is occupied now and will be available by early of next week. I will update the status by 3/13 once we finish the test |
|
|
change to 543 |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2019-02-22 11:32 | (SW) Jacky Chiang | New Issue | |
| 2019-02-28 09:40 |
|
Note Added: 0001245 | |
| 2019-02-28 09:40 |
|
Assigned To | => (PM) Sheila Tu |
| 2019-02-28 09:40 |
|
Status | new => assigned |
| 2019-02-28 13:25 |
|
Note Added: 0001268 | |
| 2019-02-28 13:51 |
|
Issue Monitored: (ALTech) SY Yoon | |
| 2019-02-28 13:51 |
|
Issue Monitored: (ALTech) Philip | |
| 2019-02-28 13:51 |
|
Issue Monitored: (HW) Sean Chiang | |
| 2019-02-28 13:51 |
|
Issue Monitored: (ALTech) Eric Kim | |
| 2019-02-28 13:51 |
|
Issue Monitored: (ALTech) Jewoo Lee | |
| 2019-03-04 13:59 | (HW) Sean Chiang | Issue Monitored: (RD) Fu-chiang Young | |
| 2019-03-04 14:00 | (HW) Sean Chiang | Assigned To | (PM) Sheila Tu => (RD) Fu-chiang Young |
| 2019-03-04 14:55 | (HW) Sean Chiang | Note Added: 0001298 | |
| 2019-03-06 14:54 | (HW) Sean Chiang | Issue Monitored: (ALTech) SB Park | |
| 2019-03-06 15:09 | (HW) Sean Chiang | Note Added: 0001355 | |
| 2019-03-13 13:57 |
|
Status | assigned => closed |
| 2019-03-13 13:57 |
|
Resolution | open => fixed |
| 2019-03-13 13:57 |
|
Note Added: 0001493 |